Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 25 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Components
|
Hybrid Solar System
|
|||
Hybrid Inverter( #/ KW)
|
3kw
|
4kw
|
5kw
|
8kw
|
Wifi/Gprs Module
|
1 Pc
|
1 Pc
|
1 Pc
|
1 Pc
|
460W Mono Solar Panel (Pcs)
|
6 Pcs
|
8 Pcs
|
10 Pcs
|
15 Pcs
|
PV Cable (m)
|
200 meters
|
300 meters
|
300 meters
|
300 meters
|
LV Lithium Battery Capacity
(Lead acid battery optional)
|
2.56 kwh
|
5.12 kwh
|
5.12 kwh
|
5.12 kwh
|
MC4 Connector (Pair)
|
4 Pairs
|
4 Pairs
|
4 Pairs
|
4 Pairs
|
Mounting System
|
Roof or Ground
|
Roof or Ground
|
Roof or Ground
|
Roof or Ground
|
50KW Hybrid Solar System
|
||||
No
|
Model
|
Description
|
QTY
|
Unit
|
1
|
Solar module
|
Mono 550W Warranty:10years |
90
|
pcs
|
2
|
Mounting System
|
Customized Roof or Ground Bracket
|
1
|
set
|
3
|
Inverter
|
50kw 3 phase inverter Hybrid,WiFi,ATESS
|
1
|
pcs
|
4
|
Battery
|
LifePO4 Lithium Battery 48V 200AH
|
Customized
|
pcs
|
5
|
DC Switch
|
Breaker
|
1
|
pcs
|
6
|
Connector
|
MC4 Waterproof
|
6
|
pair
|
7
|
Wire
|
DC,Battery wires
|
100
|
meter
|
8
|
PV Cable- Combiner BOX |
Optional
|
|
|
9
|
DC Isolator
|
Optional
|
|
Max.DC Input Power: 30kw 50kw 100kw
Max. DCInput Voltage: 600V
MPPT Voltage Range: 90-520V
Rated Grid Voltage: 400V(EU)
Warranty: 5 Years (EU) 10 Years (US)
Wifi Stick For STD, Lan & GPRS Optional.
Data Logging Stick allows you to receive information from solar power system, in order to keep you informed about the situation of your PV system, and the atmosphere conditions, everywhere and every time, thanks to our web server, accessible via Wi-Fi,Lan or GPRS.
App Available for PC, IOS & Andriod
Mounting Rail & Rail Splice Kit: AI6005 & SUS304 Bolt.
Mid & End Clamps: 35,40,45,50mm
L Foot Asphalt Shingle Moount & Hanger Bolt Optional
Cable Clip & Tie Optional
Ground Clip & Lugs Optional
Cross Section: 4mm2, 6mm2 Optional
Rated Voltage:600VDC/1000VDC(TUV)
Rated Current: 55A,70A
Colors: Black For STD, Red Optional.
Lifetime:≤25 Years
Wire Cable Cutter & Stripper,
MC3 MC4 Crimper
MC4 Connectors Assembly
Disassembly Tool
12MW Commercial Metal Roof Solar Plant in Changzhou City, Jiangsu Province, China, Finished in Nov, 2015
20MW Ground Solar Plant in USA
50MW Solar Plant in Brazil
20KW Solar Plant in Mexico
Welcome to contact us, we will do our best to cooperate with you!